• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
  • Home
  • Kitchens
  • Bathrooms
  • Blog
  • Exterior
  • Other Rooms
  • Decorate
  • The “Museum”
  • Be Safe/Renovate Safe
Retro Renovation
Retro Renovation

Retro Renovation

Remodel & decorate in Mid Century Style

  • Home
  • Kitchens
  • Bathrooms
  • Blog
  • Exterior
  • Other Rooms
  • Decorate
  • The “Museum”
  • Be Safe/Renovate Safe
Home / Bathroom / Pink Bathrooms

Kate finishes installing her B&W pink bathroom wall tiles — finally!

Kate - Updated: November 4, 2020

Retro Renovation stopped publishing in 2021; these stories remain for historical information, as potential continued resources, and for archival purposes.

pink-tile-bathroomKates-bathroomMonday afternoon felt like Christmas morning at my house. Why, you ask? Because after 90+ hours of work — planning, cutting and adhering — my B&W pink ceramic wall tiles are all finally installed. When the very last tile was put into place, the happy dancing commenced. The pink tile makes it the space “glowy,” as Pam would say. And after having the floor covered up to protect it from mortar spills during the install, it finally came out of hiding to meet the wall tiles. Let me tell you — I am in love. 

kate-pantsTo commemorate the moment, I set up a tripod and snapped a few photos of myself acting like a weirdo. As soon as the photo shoot was over, those pants went in the trash. I have this bad habit from art school of wiping my hands on my pants, which has produced a lot of “designer jeans” over the years. These bad boys were encased in mortar and nearly stood up on their own. Yuck. I had also tossed the drywall jeans. So, better figure a clothing budget into all the 84 costs to consider for a bathroom remodel, if you’re doing it DIY.

pink-ceramic-tilesAnyway, back to the bathroom. Prior to this marathon wall tile session, the only vertical tile installations in my repertoire were two, small, one-inch tile back splash jobs in my previous and current kitchen. So, given the size of this job, before beginning I researched tile installation as much as possible — trying to anticipate the unique challenges that may be encountered on my job. In reality, I’ve found that while it is great to do a lot of research to prepare for a job like this, you really do learn the most from actually doing the work. That being said and knowing what I know now, I was an absolute nut bag for attempting this tile job as my first foray into full bathroom tiling.

pink-ceramic-tile-bathroomWhile installing wall tile was not as physical a strain lifting heavy pieces of drywall and cement board, figuring out the tile layout took me a day and a half of straight mental work. I’m a very visual person who is not a math expert, so doing the tile layout meant a lot of sketches. I measured and counted tiles, obsessed over the exact size of the grout lines and how their size affects everything, and agonized over how to make the transitions around all the corners in the bathroom. After finally deciding on a pleasing layout and getting the guide lines drawn on the walls, my brain was reduced to mush.

pink-retro-bathroomOnce the layout was finalized, it was time to start putting up the full tiles. The seven-feet-high walls of of pink tile in the shower felt like an endless job. At one point, I thought I might die in there before all of the tile was installed. Tiling a shower plays games with your head.

shower-niche-pink-ceramic-tileSee that niche? It took me a solid six hours to do just this small section of the shower. The inside of the niche was especially difficult. The slightly sloped angle (which allows water to drain out) made for difficult tile cutting. Proudly though, I managed to keep all the grout lines in line. Impressed?

ceramic-wall-tiles-bathroom-closetOver Labor Day weekend, when I originally hoped to finish installing the wall tiles, I realized that the wood trim around the windows, door and closet needed to be installed before I could put in the tile near those spots. This necessitated my deciding just how I was going to frame the closet. I then had to take measurements and head off to the store to find acceptable trim for the job. During the trim shenanigans, I also accidentally hit my finger with a hammer, causing another slight delay until the throbbing slowed enough to continue.

closet-tileSo far, the closet opening is looking pretty good. Making the door for this closet terrifies me, but there is still plenty of time to figure that part out as it is not essential to finish before we can start using the bathroom.

end-of-tile-wallThe wall end-caps, the top of the partial wall, and the shower curb were difficult and slow going. It took me another whole day to do these areas. Making sure the everything was straight and that the curb sloped correctly were nerve wracking and very time consuming.

shower-curbpink-ceramic-tile-shower tile-backsplashNow the only “hole” in the tile wall is where the vanity will be built. It was helpful both in planning the vanity and for tile layout purposes, to draw the outline of the vanity directly onto the wall. Doing this made it easy for me to see where the tile backsplash should go.

b&w-pink-tilesHere are a few tips that I learned by tackling this project — for anyone thinking about attempting something similar:

  • Do spend the time agonizing over the layout. It is a lot easier to redraw lines on the wall than to remove tiles once they are adhered. The layout is, in my opinion, the hardest part of tiling.
  • Set a low row or two of tiles for the length of the wall, making sure they are level and then let them dry overnight. This will create a good base for all of the tiles above to sit on.
  • As you go, make sure to check that each new row of tile is level and plumb  — maybe not every tile, but every row. This helps prevent your suddenly realizing that your whole wall went crooked somewhere.
  • Try to make the wall as flat as possible. Lumps and humps where cement board seams meet or drywall bows a bit, happen. Do your best to keep things flush and flat.
  • Buy, borrow or rent a tile saw. You will need it.
  • Even if your tile has lugs (bumps on the edge that act as spacers), buy and use the plastic “x” spacers anyway. I bought a box of 1,200 spacers for $6. It was money well spent.
  • Pre-mixed mortar is more expensive, but saves time — says the girl who spent “only” 90 hours installing wall tile.
  • Make sure to buy extra tile. I bought 20% more 4.25″ square wall tiles than I needed, as well as extra specialty pieces like bullnose and cushion edge tiles. Some tiles will be chipped or broken in shipping and mistakes happen. Plus if 20 years down the road you need some replacements, you’ll have spares.

garage-cleaned-upI’m totally jazzed that the tiling portion of this bathroom remodel is over. Since all the tile is on the wall instead of on a palette in the garage, my husband Jim can actually park his car in there again. That makes me months early on my promise to have it cleared out before the snow flies.

Now, on to grouting.

Readers, have you attempted to tile bathroom walls before?
What tips do you have for others?

CATEGORIES:
Bathroom Pink Bathrooms

YOU MAY ALSO LIKE

  • starburst-shower-door
    Sterling 'Starscape' -- still the funnest shower door for a midcentury bathroom
  • vintage pink bathroom
    The color pink in bathroom sinks, tubs and toilets -- from 1927-1962 -- and beyond!
  • be safe renovate safe graphic
    Make a resolution to: Be Safe and Renovate Safe!
  • retro bathroom tile
    Tile in retro colors for your mid century bathroom -- 36 places to find them
  • new pink bathroom
    Nanette & Jim's Mamie pink bathroom -- built from scratch -- to look like it's always been there

Reader Interactions

Comments are closed. 

97 comments

Comments

  1. Jan says

    September 11, 2013 at 5:01 pm

    Kate, Kate, Kate! Your bathroom is absolutely gorgeous! What a great job you guys did! And I know Leo was probably a big help! Beautiful! (And just save those jeans – I’m sure you’ll be working on another project or two in the future!).

    • Kate says

      September 11, 2013 at 5:02 pm

      Don’t worry Jan, I have a whole pile of “work jeans” for more projects. Those were pretty bad, and with that much mortar built up on them, I’m not going to attempt to wash them, so out they go…

  2. PF Flyer says

    September 11, 2013 at 2:32 pm

    Nice job except I would have used a cove base where wall meets floor…easier to clean and in many commercial projects mandated by code.

    • Robin, NV says

      September 11, 2013 at 3:58 pm

      I had the same thought. That’s what I’d do if I was tiling the walls in my bathroom. But we’ll just have to wait for the next exciting chapter of Kate’s Pink Potty Adventure to see where she goes. She’s a thinker, I’m sure she’s planned everything down to the last detail – and I find that her style is spot on!

    • Kate says

      September 11, 2013 at 4:59 pm

      Cove base is much trickier to install, and I was already feeling overwhelmed with how much I had to do in there, so I skipped it. Plus, my other bathroom does not have cove base. My house told me not to do it. 😉

      • Mary Elizabeth says

        September 12, 2013 at 7:36 am

        Don’t admit that our houses talk to us about what they want. Your new readers. like Lor, will thing we’ve all gone squirrel food.

  3. Eartha Kitsch says

    September 11, 2013 at 2:03 pm

    It looks absolutely beautiful with the floor tile. Wow, girl…that was a LOT of work! And I honestly don’t think that you could have done such a great job if you weren’t as detail oriented and as much of a planner as you are. I think that’s what it takes to do a great tile job. Once you get rested and the whole bathroom is done, you’ll have time to really appreciate how much you slaved away in there.

    • Kate says

      September 11, 2013 at 5:01 pm

      Thanks Eartha Kitsch — yes, slaving away sounds about right. When the rest of the world was having Labor Day picnics and BBQs, I was installing tile… I’m sure it will all be worth it in the end though, so far I LOVE my pink bathroom!

  4. Barbara says

    September 11, 2013 at 1:23 pm

    Great job and good for you to choose the color that makes you happy and suits the time period in which your house was built!

  5. Jmb says

    September 11, 2013 at 12:19 pm

    Nice work Kate, and some very good advice.

    However you asked for additional tips, so here goes.

    If you take the walls down to the studs, start checking things are going to be straight and plumb before putting up wallboards. These boards can be shimmed on the stud side so you don’t discover waves or odd angles once the tile is set.

    I agree that the layout is the hardest part of the job, but all that forethought pays off when setting hundreds of tile and fatigue sets in.

    In my case I tiled my bath surround first, walls second, sink and vanity and then lastly the floor so I would damage my floor tiles while doing the other work.

    Also, when tiling a floor, I try to keep the custom cuts closest to my cabinets since I used wood base boards and quarter round trim which cover minor imperfections in my field tile.

    That’s about all I can think of. Again great job!

    • Kate says

      September 11, 2013 at 12:42 pm

      Hi Jmb, thanks for the additional advice.

      I did take my bathroom down to the studs, however when I made the shower bigger, there were some uneven studs in the wall that I couldn’t remove without damaging the room next door. I did my best to make the wall flat but there is still a bit of a hump there. You can’t really see it unless you know to look for it, and it drives me a little nuts, but I did my best and I think the average person will not notice it at all…

  6. Carole says

    September 11, 2013 at 11:48 am

    Congratulations! It looks fabulous.

    I’ve done a little tile work w/ my husband, but I’m not sure I’d have the confidence to take on as large of a job as this. I’m also extremely visual (artist), and a perfectionist to boot, so I’d probably never be finished. lol

    You should be proud! Imagine the looks on peoples faces when you tell them, “I tiled this entire room myself”!

    Good luck with the jean shopping. I hate shopping for clothing of any kind.

  7. June Cahill says

    September 11, 2013 at 11:29 am

    btw, I once had my tile guy install 1in mosaics on my counter top. He told me he saw ‘little squares’ in his sleep!

    • Kate says

      September 11, 2013 at 11:32 am

      Yes, I’ve been dreaming about pink squares a lot lately…. 😉

  8. June Cahill says

    September 11, 2013 at 11:27 am

    WOW. Just WOW. What patience, persistence, perseverance! Can’t wait to see it grouted! (I know, never satisfied!;)

    You da GIRL!

  9. Sara Gee says

    September 11, 2013 at 11:18 am

    It looks SOOOOO good! I can’t even imagine how much work went into this. And I feel like (like myself) you are probably a perfectionist, and some of those tiles took ages to line up properly!

    When you are all done you should totally have a bathroom-warming party. Because this deserves a celebration. And adult beverages!

  10. cari says

    September 11, 2013 at 10:45 am

    Perfect! Well done, Kate! If you come to my house and teach me to tile, I will buy you a new pair of jeans.

    • Kate says

      September 11, 2013 at 11:05 am

      🙂

« Older Comments
Newer Comments »

Primary Sidebar


Footer

Follow Along

  • Facebook
  • Instagram
  • RENOVATE SAFE
  • About
  • Blog
  • The “Museum”
  • Kitchens
  • Bathrooms
  • Exterior
  • Other Rooms
  • Terms of Service
  • Privacy Notice
  • Disclosures
  • Contact

© 2026 Retro Renovation® • All Rights Reserved • Website by Anchored Design
Please do not use any materials without prior permission. Portrait by Keith Talley Photography